A successful warehouse project begins with proper coordination between the steel superstructure and the supporting foundation system. Even minor discrepancies between PEB drawings and civil works can lead to delays, rework, and additional costs during construction.
Mettler provides PEB General Arrangement (GA) Drawing Vetting and Substructure Design Services to ensure that the proposed steel building system aligns with the project’s architectural, structural, and operational requirements before fabrication and construction begin.
Our team reviews critical building parameters such as dimensions, clear heights, bay spacing, column locations, roof and wall systems, loading requirements, mezzanines, crane provisions, and other project-specific interfaces. Based on the approved PEB inputs and design criteria, we develop coordinated foundation and substructure designs that support efficient project execution.